Saturday, December 31, 2011

Finished

We have been done for a few months, but with unpacking and getting organized and then holidays - we forgot to post come final shots. More to come, but here are a few...





















Tuesday, October 11, 2011

Moved in!

This was a big weekend for the Myers family, we moved back in! Ok, so the house wasn't really move-in ready mid-week prior to the weekend, but Adam and crew worked hard to get at least one working bathroom and to complete the master bedroom (we didn't remodel the Lucy and Betsy's rooms, so those just needed to be cleared out since they were used as storage, and dusted). The Merry Maids came over Sat AM to help clean up, and we made the move Sat afternoon after naps. We cooked dinner at home Sat and Sun. Mark took Monday off from work to celebrate Columbus day of course, but also to help unpack boxes and move things around so the workers can continue to finish things up. This week (week of 10/10) will be very busy with workers around, but by the end of the week, we should have all electrical done (eg lights in all rooms, power outlets, TV/Internet back-up etc), and all bathroom plumbing fixtures hooked up. Also, the railing on the deck is being finished, so we can finally let the girls walk out there! Enjoy the new pics.




Interior shot of the garage door. The space in the garage is getting cleaner.




After a 3 hour re-installation, we now have all the Internets back-up! TV and phone should be wired by Tues.




Speaking of TV, it's now on the wall with in-wall surround :)















The half of the master shower that is installed. The other side (hint, it looks exactly like this side, but opposite) is getting installed this week.











Shot from alley of exterior with new garage door and railing. Railing should be complete Tues also.













Garage door, woohoo!















Railing being installed down backyard steps. Gotta have this or the COC (certificate of completion) won't be issued.

















Deck off master bedroom, railing looks nice.


















Thursday, October 6, 2011

Paint done. Mad dash to get it ready (enough) to move in Sat 10/8!

Countertops re-emerge after painting is done


Color= Squire Hill Buff

Where? Everywhere


Master bedroom trimed and painted. Once carpet gets installed (today, Thurs), it will look complete.





Shower glass also installed today (Thurs). Told you it was going to be a mad dash these 48 hours.






Sunday, October 2, 2011

One week to go!

New bannister to the downstairs




D-R-I-V-E-W-A-Y!!



The concrete guys built the curb to go diagnal with where the fence line will be.






Here's how you paint a bunch of doors at the same time







Monday, September 19, 2011

The two week countdown!!!

Who's dog is that...?


Closet for guest bedroom.


This is what our interior doors will look like, solid core, flat front, very cool. This one is from the garage to the hallway.






Another shot of the girls' bathroom







Marble slab tubdeck with white shower tile in back.









Marble counter in master bath, we think it turned out great.











Shot of the counter, 1 sink and tubdeck.












Friday, September 9, 2011

Getting Closer...

Oh yea, and a new mailbox :)

M&L in the slab warehouse picking out our marble slab for the master bedroom.






That's the one!








Travertine shower for our guests!










Floors downstairs tiled, thanks Jim.












Master bath tile floor, looks great.






























Girls' bath floor and shower tiled, also looks great!






































Thursday, September 8, 2011

Drywall complete, on to tile and cabinets

Home Depot delivering a few thousand pounds of tile, and that wasn't even all of it.



Tile and cabinets are stockpiling in the garage.



Master tub is in and the tub deck is being built for tiling and marble slab to go on top. Girls' tub is also in but not pictured.







Totally awesome concrete stairs leading down from deck off master bedroom. Great suggestion by our contractor Adam.









Same style of steps also go from back deck to back patio. Much cleaner look than traditional wood. Jim Zahnow and team are working on tile this week, will post pics of that this weekend.








Saturday, August 20, 2011

Drywall mostly in, and some update shots


Master bedroom windows and sliding door




Master bedroom and door to master bath






Master bath where vanity will go









Master closet










Master bedroom where TV will hang, and door to hallway












Lights and speaker wire for outside deck!













View of backyard deck (off dining room) from bedroom deck.




















The smurf tube is even blue!
















Cabinet where the A/V components will go for big TV room



















We almost had to get a new panel, but got by with this sub-panel addition























Say cheese, new deck!